Tensor NZ
Tensor NZ: a one-person-owned Auckland power retailer, still trading
Tensor NZ is an independent electricity retailer in Grey Lynn, Auckland, run by Tensor NZ Limited, a company incorporated on 5 September 2017 and wholly owned by its sole director, Marcus Sin. In October 2026 Tensor is still trading: it supplies only Auckland homes and businesses with a smart meter, prices each property by quote, and had 8 connections at the end of August 2026, a tiny customer base even by the standards of New Zealand's small retailers.
Tensor calls itself a "digital-first power company" building an "Open Energy Network", where energy and data from EVs, solar, batteries and heat pumps work together. It is not related to TeamViewer Tensor or other technology products that share the name.
- 8 connections at 31 August 2026 (12 at the 2024 peak)
- Auckland only, with a smart meter
- 2017 Tensor NZ Limited incorporated
- Trading company registered, return filed 2 July 2026
The company
Who owns Tensor NZ?
Tensor NZ Limited (company number 6429932, NZBN 9429046340467) was incorporated on 5 September 2017 and trades as Tensor NZ. Its sole director since that day is Marcus Sin, who also holds all 1,000 shares, so Tensor has no parent company or outside shareholder. The registered office is in his care at 30 Pollen Street, Grey Lynn, Auckland 1021, the address shown on tensor.co.nz.
Tensor describes itself as "independently owned" and a "certified reconciliation participant in the NZ electricity market", meaning it holds its own trader code and settles its customers' consumption in the wholesale market. As a retailer it is a member of Utilities Disputes, the free complaints scheme, and follows the Electricity Authority's consumer care rules through its Consumer Care Policy of 1 July 2023.
5 Sep 2017
Tensor NZ Limited is incorporated, with Marcus Sin as director and sole shareholder.
Feb 2021
Tensor's trader code TTTL supplies its first connection.
Jan 2022
Tensor's terms and service charges take effect (still in force in 2026).
Dec 2022
8 connections.
Jul 2023
Consumer Care Policy published.
Jun 2024
Peak of 12 connections, held until August 2024.
Apr 2026
Down to 8 connections, after 9 through 2025.
Jul 2026
Annual return filed; the company stays registered.
Our take
Tensor at a glance: what it offers and what to weigh
Tensor suits an Auckland home or small business with a smart meter that wants a direct, email-based relationship with a very small retailer. The balance:
Strong points
- No fixed term for homes: open term plans by default, cancel at any time.
- Cost plus margin pricing, billed monthly on actual smart meter data.
- No deadlocked complaint listed at Utilities Disputes for April 2025 to March 2026.
- Business discounts of 1.5% or 3.0% for a 12 or 24 month fix.
Watch out for
- No public prices: you only see a rate after a quote, so it is hard to compare.
- No phone line: email, a contact form and a weekday website chat only.
- Auckland smart meters only, and a tiny base of 8 connections.
- Bank transfer is the payment method in its terms, within 14 days of each monthly invoice.
Tensor plans
What Tensor charges: prices by quote
Tensor publishes no rate card and our comparator holds no Tensor plans. Here is what it does publish, as at 14 October 2026.
Tensor plans: published terms and charges
Published fees, as at 14 October 2026 · Tensor prices page
- Rates per kWh
- By quote
- How prices are set
- Cost plus margin
- Who can join
- Auckland
- Home plans
- Open term
- Business 12-month fix
- 1.5% off
- Business 24-month fix
- 3.0% off
- Price changes
- 30 days' notice
- Billing
- Monthly
After an address or ICP check on tensor.co.nz
Tensor's cost of getting power to you, plus a margin
Homes and businesses with a remotely read smart meter
The default option; cancel at any time
The standard variable rate; $300 + GST exit fee per ICP
Plus a signing bonus; $600 + GST exit fee per ICP
With reasons; an individual notice if charges rise by more than 5%
On actual smart meter data, paid within 14 days
Sources: Tensor prices page (service charges effective 1 January 2022), residential and business pages, and terms effective 1 January 2022, all read on 14 October 2026. Service charges include GST; business exit fees are plus GST.
Cost plus margin, by quote
Tensor says it sets its prices "equal to our costs of getting power to you, plus a margin", reviewed daily with cloud tools. You get a price after an address or ICP check on its website. Details: Tensor rates and terms, line by line.
Open term by default, fixed for business
Homes go on an open term plan by default, which you can cancel at any time. Businesses can fix for 12 months (1.5% off the standard variable rate) or 24 months (3.0% off plus a signing bonus), with an exit fee per connection if they leave early.
Explained
Tensor in October 2026: status, size, model and coverage
Still trading, not closed or sold
Tensor has not exited the market. On 14 October 2026 the Companies Register showed Tensor NZ Limited as Registered, with its annual return filed on 2 July 2026, and tensor.co.nz was live with a 2026 copyright line, a customer login and a sign-up form that checks your address or ICP number. We found no announcement of a closure, a sale or a transfer of customers to another retailer, and Tensor is still listed as a member of Utilities Disputes.
Our comparison engine marks Tensor as inactive and holds no Tensor plans. That reflects the fact that Tensor publishes no prices we can compare, not a decision by Tensor to stop trading.
A very small retailer: 8 connections
Electricity Authority data first shows Tensor's trader code, TTTL, supplying 1 connection in February 2021. It grew to 8 by December 2022 and peaked at 12 from June to August 2024, then eased to 9 in 2025 and 8 from April 2026. In August 2026, 4 of those 8 connections were residential. Out of 2,372,620 connections nationwide that month, Tensor's share rounds to 0.00%.
Auckland and smart meters only
Tensor says it "currently only supplies smart meter customers located in Auckland". Its terms require a meter that sends your usage remotely every day, and its outages page names two lines companies: Vector (North Shore, Wellsford to Papakura) and Counties Energy (southern Auckland and northern Waikato). Outside those areas, or without a smart meter, Tensor cannot supply you.
A data-first model
Tensor buys its power on the wholesale market, "just like everybody else", and runs on software it built and owns. Its stated aim is an energy network that connects EVs, solar, battery storage and heat pumps, so it can earn from more than selling kWh. In practice, what it sells today is electricity, billed monthly from smart meter data, with an online portal to track daily use and spend.
Homes and small businesses
Tensor serves both. Homes get open term plans as the default, with no fixed contract. Businesses can stay open term at the standard variable rate or fix for 12 or 24 months at a discount; they must give a verified NZBN, and the address on the Companies Register must be the one Tensor supplies. Tensor sells no gas, broadband or solar buy-back plan, and has no app. Its blog, last updated in August 2023, covers pricing structures, three-phase power and open data.
Want to see how Tensor compares?
Our comparator does not price Tensor yet. Compare the plans we price for your lines network, your usage and your meter, then ask Tensor for a quote for your address.
Live from our data: 38 standard-meter plans from 9 retailers on Vector (Auckland), priced at 7,000 kWh a year incl. GST. Your own saving depends on the plan you are on now, your network, usage and meter.
FAQ
Tensor NZ: questions about the company
Yes. In October 2026 Tensor NZ is still operating: Tensor NZ Limited is registered, filed its annual return on 2 July 2026, and supplied 8 connections in Auckland at 31 August 2026. Its website still offers sign-up, and it is still a member of Utilities Disputes. We found no closure, sale or transfer of customers to another retailer.
Tensor NZ is an independent electricity retailer in Grey Lynn, Auckland, run by Tensor NZ Limited and owned by its director, Marcus Sin. Tensor energy, or Tensor power, is sold only to Auckland homes and businesses with a smart meter, priced by quote at cost plus a margin and billed monthly, with no gas, broadband or app.
Yes, in Auckland only: tensor.co.nz still invites Auckland homes and businesses with a smart meter to sign up through an address or ICP check, and prices each property by quote. Tensor can decline an application, for example if the property has no remotely read smart meter or sits outside the Vector and Counties Energy networks.
Marcus Sin owns Tensor NZ. He has been the sole director of Tensor NZ Limited (company 6429932) since its incorporation on 5 September 2017 and holds all 1,000 shares, so Tensor has no parent company or outside shareholder. Its registered office is 30 Pollen Street, Grey Lynn, Auckland 1021, and it describes itself as independently owned.
No. Tensor says it "currently only supplies smart meter customers located in Auckland", on the Vector network (North Shore, Wellsford to Papakura) and the Counties Energy network (southern Auckland and northern Waikato). Its terms also require a meter that sends usage remotely every day. Outside those areas, our comparator prices the retailers open where you live.
Tensor had 8 connections at 31 August 2026, 4 of them residential, according to Electricity Authority data for its trader code TTTL. That is down from a peak of 12 between June and August 2024, and 9 through 2025. Out of 2,372,620 connections nationwide, Tensor's share rounds to 0.00%.
No. Tensor energy, Tensor NZ Limited, is an independent Auckland electricity retailer founded in 2017 and owned by Marcus Sin. TeamViewer Tensor is remote-access software from a different company, and NVIDIA TensorRT and other technology products named Tensor are unrelated too. The power retailer's website is tensor.co.nz.
Tensor started selling electricity in February 2021, when Electricity Authority data first shows its trader code, TTTL, supplying one connection. The company, Tensor NZ Limited, was incorporated earlier, on 5 September 2017. Its terms and service charges took effect in January 2022, and it grew to 8 connections by December 2022.